ZE BluePower
End-to-end installation of extrusion lines with controlled alignment from the dosing system to the downstream equipment.
Line installation- Extruder
- Twin-screw
- Application
- Compounding
- Installation
- Complete line
- Project scope
- Transport to handover
Assembly scope for ZE BluePower
On compounding and recycling lines, the common axis determines installation quality. We position the extruder, dosing system and downstream units in a defined sequence and document alignment and connections.
From transport to a running machine
No open interfaces between haulage, positioning and assembly. We plan and coordinate the complete sequence through documented handover, with one site manager as your continuous point of contact.
- 01
Transport planning
Collection point, delivery window, access, weights and required lifting equipment are coordinated in advance.
- 02
Delivery & unloading
We coordinate arrival, unloading and the safe transfer of machine components on site.
- 03
Moving in & positioning
Every section follows the planned access route to its defined installation position.
- 04
Mechanical assembly
Positioning, alignment, levelling, connection and anchoring to foundation plans and manufacturer specifications.
- 05
Connections & peripherals
Electrical systems, utilities, hydraulics, temperature control, robotics and peripherals are fully connected.
- 06
Commissioning & handover
Testing, dry run, first sample and documented handover complete the project scope.
One responsibilitySchedule, transport coordination, assembly and documentation stay with one team.
Alignment of extruder, gearbox and downstream units
✓Dosing, utility and electrical connections
✓Functional check and prepared material run
✓Assembly in practice
Industrial and installation impressions from our field of work. The images illustrate the scope of our services.
Is this machine on your project plan?
Send us the machine type, location and preferred date. We will reply with a concrete installation proposal.